Personal information

Artificial Intelligence, Asset Management , Contract Management, Time Management , Facility Management , FIDIC
Egypt

Activities

Employment (1)

Helwan University: Cairo, EG

2012-09-11 to present (Civil Engineering Department)
Employment
Source: Self-asserted source
Mohamed Tantawy

Education and qualifications (4)

Robert Gordon University: Aberdeen, GB

LLM (Law School)
Education
Source: Self-asserted source
Mohamed Tantawy

Project Management Institute: Newtown Grant, Pennsylvania, US

(PMP)
Qualification
Source: Self-asserted source
Mohamed Tantawy

Chartered Institute of Arbitrators: London, GB

Member
Qualification
Source: Self-asserted source
Mohamed Tantawy

Mansoura University Faculty of Medicine: Mansoura, EG

2005 to 2012 | Ph.D. (Structure Engineering Department)
Education
Source: Self-asserted source
Mohamed Tantawy

Professional activities (1)

Chartered Institute of Arbitrators: London, London, GB

2019-10 to present | Member
Membership
Source: Self-asserted source
Mohamed Tantawy

Works (17)

Analyzing Cost Overrun Risks in Construction Projects: A Multi-Stakeholder Perspective Using Fuzzy Group Decision-Making and K-Means Clustering

Buildings
2025-01-31 | Journal article
Contributors: Ahmed Mohammed Abdelalim; Maram Salem; Mohamed Salem; Manal Al-Adwani; Mohamed Tantawy
Source: check_circle
Crossref
grade
Preferred source (of 2)‎

Cost Overrun Risk Assessment for Healthcare Projects: A Modified Fuzzy Group Decision-Making Approach

Journal of Construction Engineering and Management
2024-12 | Journal article
Contributors: Muhammad Saiful Islam; Mohamed Salem; Mohamed Tantawy; Mohamed Salah
Source: check_circle
Crossref

An Analysis of Factors Contributing to Cost Overruns in the Global Construction Industry

Buildings
2024-12-25 | Journal article
Contributors: Ahmed Mohammed Abdelalim; Maram Salem; Mohamed Salem; Manal Al-Adwani; Mohamed Tantawy
Source: check_circle
Crossref
grade
Preferred source (of 2)‎

An Analysis of Factors Contributing to Cost Overruns in the Global Construction Industry

2024-12-04 | Preprint
Contributors: Ahmed Mohammed Abdelalim; Maram Salem; Mohammed Salem; Manal Al-Adwani; Mohammed Tantawy
Source: check_circle
Crossref
grade
Preferred source (of 2)‎

Critical Success Factors for the Widespread Adoption of Virtual Alternative Dispute Resolution (VADR) in the Construction Industry: A Structural Equation Modeling Analysis

Buildings
2024-09-23 | Journal article
Contributors: Mohamed Salem; Ruqaya S. Al-Sabah; Mohamed T. Elnabwy; Emad Elbeltagi; Mohamed Tantawy
Source: check_circle
Crossref
grade
Preferred source (of 2)‎

Variations and Claims in International Construction Projects in the MENA Region from the Last Decade

Buildings
2024-08-13 | Journal article
Contributors: Ahmed Mohammed Abdelalim; Ruqaya Al-Sabah; Mohamed Salem; Salah Omar Said; Mohamed Tantawy; Mohamed Ramadan Ezz Al-Regal
Source: check_circle
Crossref
grade
Preferred source (of 2)‎

BIM Adoption in MENA's Construction Industry: A Contractor's Perspective

Civil Engineering Journal
2024-08-01 | Journal article
Contributors: Mohammad Sadeq Abdullah; Mohamed Salem; Salah Omar Said; Mohamed Tantawy
Source: check_circle
Crossref
grade
Preferred source (of 2)‎

Agent-Based Modeling for Construction Resource Positioning Using Digital Twin and BLE Technologies

Buildings
2024-06-13 | Journal article
Contributors: Ahmed Abdelalim; Salah Said; Aljawharah Alnaser; Ahmed Sharaf; Adel ElSamadony; Denise-Penelope Kontoni; Mohamed Tantawy
Source: check_circle
Crossref
grade
Preferred source (of 2)‎

Integration of Blockchain-Enabled Smart Contracts in Construction: SWOT Framework and Social Network Analysis

Civil Engineering Journal
2024-05-01 | Journal article
Part of ISSN: 2476-3055
Part of ISSN: 2676-6957
Contributors: Monica Ghaly; Emad Elbeltagi; Adel Elsmadony; Mohamed A. Tantawy
Source: Self-asserted source
Mohamed Tantawy

Variations & Claims in International Construction Contracts (FIDIC) from Statistical Perspective in MENA Region for the Last Decade

2024-05-01 | Preprint
Contributors: Ahmed Mohammed Abdelalim; Mohamed Ramadan Ezz Al Regal; AlJawharah A. AL Nasser; Rawan Alwahaibi; Mohamed Tantawy
Source: check_circle
Crossref

Fuzzy Decision Making and Statistical Analysis of Key Factors Affecting Claim Management Process Groups in Construction Projects

2024-04-29 | Preprint
Contributors: Ahmed Mohamed Abdelalim; Mohamed Galal Badawy; AlJawharah A.AL Nasser; Nujud Khalid Alangari; Mohamed Tantawy
Source: check_circle
Crossref

SCHEDULING OF REPETITIVE PROJECTS USING LINE OF BALANCE FOR DIFFERENT SCENARIOS OF ACTIVITIES’ DURATION UNCERTAINTY

International Journal of Advanced Engineering and Business Sciences
2023-06-01 | Journal article
Part of ISSN: 2682-2946
Contributors: Safaa Mohammed; Ahmed Elhakeem; Mohamed Tantawy
Source: Self-asserted source
Mohamed Tantawy

Critical Success Factors for BIM Implementation in Construction Projects

Saudi Journal of Civil Engineering
2020-11-30 | Journal article
Part of ISSN: 2523-2657
Part of ISSN: 2523-2231
Contributors:   A. M. Darwish; Emad Elbeltagi; M. M. Tantawy
Source: Self-asserted source
Mohamed Tantawy

Developing Framework to Optimize the Preparation of (EOT) Claims Using Integration of (LPS) and (BIM) Techniques in Construction Projects

JES. Journal of Engineering Sciences
2020-11-01 | Journal article
Part of ISSN: 2356-8550
Contributors: Adel El-Samadony; Mohamed Tantawy; Mohamed M. Atta
Source: Self-asserted source
Mohamed Tantawy

Agent-Based Modeling for Construction Resource Positioning Using Digital Twin and BLE Technologies

Source: check_circle
Multidisciplinary Digital Publishing Institute
grade
Preferred source (of 2)‎

Asset management: The Ongoing Crisis

Conference paper
Source: Self-asserted source
Mohamed Tantawy

Major Residential Building Cost Variables in Egypt

Journal article
Source: Self-asserted source
Mohamed Tantawy

Peer review (1 review for 1 publication/grant)

Review activity for Innovative infrastructure solutions. (1)