Personal information

Verified email addresses

Verified email domains

United Kingdom

Activities

Employment (7)

University College London: London, GB

Employment
Source: check_circle
University College London

University of Cambridge: Cambridge, GB

2022-07 to 2024-06 | Digital Roads of the Future Programme Manager (Engineering)
Employment
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra

Kingston University: Kingston-Upon-Thames, London, GB

2021-11-01 to 2022-07-07 | Lecturer (Civil Engineering, Surveying and Construction Management)
Employment
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra

University of Cambridge: Cambridge, Cambridgeshire, GB

2017-10-01 to 2021-10-01 | PhD Student (Department of Engineering)
Employment
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra

University of Cambridge: Cambridge, Cambridgeshire, GB

2020-09-01 to 2020-12-11 | BIM School Instructor (Department of Engineering)
Employment
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra

British Centre of Applied Studies: Doha, QA

2017-05 to 2017-07 | Lecturer (Building Studies)
Employment
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra

University of Moratuwa: Moratuwa, LK

2016-05-01 to 2017-04-30 | Lecturer (Department of Building Economics)
Employment
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra

Education and qualifications (6)

Advance HE: York, GB

2025-02 to present | Fellow (FHEA)
Education
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra

Advance HE: York, GB

2022-07 to 2025-02 | Associate Fellow (AFHEA)
Education
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra

University of Cambridge: Cambridge, GB

2023-08 to 2024-09 | Postgraduate Certificate in Teaching and Learning in Higher Education (Cambridge Centre for Teaching and Learning)
Education
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra

Rice University: Houston, US

2021-12 to 2022-12 | Postgraduate Certificate Course in Engineering Project Management Specialisation
Education
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra

University of Cambridge: Cambridge, GB

2017-10-13 to 2021-09-21 | Doctor of Philosophy (Engineering)
Education
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra

University of Moratuwa: Moratuwa, LK

2011-10-11 to 2016-02-01 | BSc (Hons) in Quantity Surveying (Department of Building Economics)
Qualification
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra

Professional activities (2)

University of Cambridge: Cambridge, GB

2024-09 to 2025-09 | Academic Chair of the Early Career Academics and Professional Panel at CSIC (Engineering)
Invited position
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra

European Council on Computing in Construction (EC3) Summer School: Rhodes, GR

2021-12 to 2022-07 | Chair
Invited position
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra

Works (44)

An Integrated Solution for Automatic 3D Object-based Information Retrieval

2024-07-29 | Conference paper
SOURCE-WORK-ID:

2303305

Contributors: Ya Wen; Mudan Wang; M R Mahendrini Fernando Ariyachandra; Guangming Wang; Ioannis Brilakis; Lizhao Xiao
Source: check_circle
University College London

Knowledge Driven Rule-Based Building Geometric Digital Twin Construction: State of the Art Review

2024-07-17 | Conference paper
SOURCE-WORK-ID:

2303306

Part of ISSN: 2684-1150
Contributors: Ya Wen; Mudan Wang; M R Mahendrini Fernando Ariyachandra; Ran Wei; Ioannis Brilakis; Lizhao Xiao
Source: check_circle
University College London

Leveraging railway topology to automatically generate track geometric information models from airborne LiDAR data

Automation in Construction
2023-11 | Journal article
Part of ISSN: 0926-5805
Contributors: M.R. Mahendrini Fernando Ariyachandra; Ioannis Brilakis
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra
grade
Preferred source (of 2)‎

Dispute Risk Management in the Procurement Systems Used in High-Rise Building Projects

ITU Press, Press of the Istanbul Technical University
2023-11-09 | Journal article
Contributors: B.A.K.S. Perera; A.L. Samarakkody; A.D. Palihakkara; D.M.C.K. Dissanayake; M.R.M.F. Ariyachandra
Source: check_circle
Crossref
grade
Preferred source (of 2)‎

Digital Twin Smart Cities for Disaster Risk Management: A Review of Evolving Concepts

Sustainability
2023-08 | Journal article | Author
Contributors: M R Mahendrini Fernando Ariyachandra; Gayan Wedawatta
Source: check_circle
Multidisciplinary Digital Publishing Institute

Automating the Generation of Geometric Information Models to Support Digital Twinning of Existing Rail Infrastructure

2022 | Dissertation or Thesis
Contributors: Ariyach; ra, Mahendrini Fern; o
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra

Application of railway topology for the automated generation of geometric digital twins of railway masts

ECPPM 2021--eWork and eBusiness in Architecture, Engineering and Construction
2021 | Book chapter
Contributors: Ariyach; ra, MRMF; Brilakis, Ioannis
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra

Automated Generation of Railway Track Geometric Digital Twins (RailGDT) from Airborne LiDAR Data

EG-ICE 2021 Workshop on Intelligent Computing in Engineering
2021 | Conference paper
Contributors: Ariyach; ra, Mahendrini Fern; o; Brilakis, Ioannis
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra

Generating Railway Geometric Digital Twins from Airborne LiDAR Data

EC3 Conference 2021
2021 | Conference paper
Contributors: Ariyach; ra, MR; Brilakis, Ioannis
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra

Generating Railway Geometric Digital Twins from Airborne LiDAR Data

Proceedings of the European Conference on Computing in Construction
2021-07-28 | Conference paper
SOURCE-WORK-ID:

2286633

Part of ISSN: 2684-1150
Contributors: M R Mahendrini Fernando Ariyachandra; I Brilakis
Source: check_circle
University College London

Application of Railway Topology for the Automated Generation of Geometric Digital Twins of Railway Masts

2021-07-26 | Conference paper
SOURCE-WORK-ID:

2292560

Contributors: M R Mahendrini Fernando Ariyachandra; Ioannis Brilakis
Source: check_circle
University College London

Automated Generation of Railway Track Geometric Digital Twins (RailGDT) from Airborne LiDAR Data

EG-ICE 2021 Proceedings: Workshop on Intelligent Computing in Engineering
2021-06-30 | Conference paper
SOURCE-WORK-ID:

2286634

Contributors: M R Mahendrini Fernando Ariyachandra; I Brilakis
Source: check_circle
University College London

Detection of railway masts in airborne LiDAR data

Journal of Construction Engineering and Management
2020 | Journal article
Contributors: Ariyach; ra, MRMF; Brilakis, Ioannis
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra
grade
Preferred source (of 4)‎

Digital twinning of railway overhead line equipment from airborne lidar data

Proceedings of the 37th International Symposium on Automation and Robotics in Construction, ISARC 2020: From Demonstration to Practical Use - To New Stage of Construction Robot
2020 | Conference paper
EID:

2-s2.0-85109386082

Contributors: Ariyachandra, M.R.M.F.; Brilakis, I.
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra via Scopus - Elsevier

Demystifying the Role of an Information Manager in BIM Based Projects: The Skills and Competencies Required

2020-11-14 | Conference paper
SOURCE-WORK-ID:

2292564

Contributors: M R Mahendrini Fernando Ariyachandra; Himal Suranga Jayasena; Kanchana K S Perera
Source: check_circle
University College London

Demystifying the Role of an Information Manager in BIM Based Projects: The Skills and Competencies Required

The 6th International Project and Construction Management Conference (IPCMC 2020)
2020-11-12 | Conference paper
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra

Digital Twinning of Railway Overhead Line Equipment from Airborne LiDAR Data

Proceedings of the 37th International Symposium on Automation and Robotics in Construction (ISARC)
2020-10-28 | Conference paper
Part of ISBN: 9789529436347
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra
grade
Preferred source (of 3)‎

Competencies Expected from an Information Manager Working in BIM Based Projects

International Journal of Construction Education and Research
2020-08-18 | Journal article
Part of ISSN: 1557-8771
Part of ISSN: 1550-3984
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra
grade
Preferred source (of 4)‎

Automatic detection of railway masts using air-borne LiDAR data

2020-04-30 | Conference paper
SOURCE-WORK-ID:

2292565

Contributors: M R Mahendrini Fernando Ariyachandra; Ioannis Brilakis
Source: check_circle
University College London

Automatic detection of railway masts in air-borne LiDAR data

Transport Research Arena (TRA) 2020, "Rethinking transport – towards clean and inclusive mobility"At: Helsinki, Finland (Conference cancelled)
2020-04-27 | Conference paper
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra
grade
Preferred source (of 2)‎

Understanding the challenge of digitally twinning the geometry of existing rail infrastructure

2019-12-06 | Conference paper
SOURCE-WORK-ID:

2335211

Contributors: M R Mahendrini Fernando Ariyachandra; Ioannis Brilakis
Source: check_circle
University College London

Understanding the Challenge of Digitally Twinning the Geometry of Existing Rail Infrastructure

12th FARU International Research Conference (Faculty of Architecture Research Unit)
2019-12-03 | Conference paper
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra
grade
Preferred source (of 2)‎

Real-virtual synchronisation: a review on the state-of-the-art geometric digital twinning of infrastructure

Proceedings of the 8th World Construction Symposium WCS 2019
2019-11-08 | Conference paper
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra
grade
Preferred source (of 4)‎

Competencies expected of graduate quantity surveyors working in developing countries

Journal of Financial Management of Property and Construction
2018-08-06 | Journal article
Part of ISSN: 1366-4387
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra
grade
Preferred source (of 4)‎

Challenges of transcending BIM information from design phase to real time on-site construction phase

2017 | Journal article
Contributors: Wijewickrama, MKCS; Jayasena, HS; Ariyach; ra, MRMF
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra

Procurement system selection model for the Sri Lankan construction industry

The 6th World Construction Symposium 2017: What's New and What's Next in the Built Environment Sustainability Agenda?
2017 | Conference paper
Contributors: R.A.C. Chanudha, P.A.P.V.D.S. Disaratna, S.M.N. Anuruddika; M.R.M.F. Ariyach; ra
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra

Software capabilities of Sri Lankan architectural professionals for BIM adoption

2017 | Journal article
Contributors: Kumara, EKAS; Jayasena, HS; Ariyach; ra, MRMF
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra

Strategies to develop effective BIM models to suit 4D modelling

2017-09-10 | Conference paper
SOURCE-WORK-ID:

2335226

Contributors: M M M Disthikar; Himal Suranga Jayasena; M R Mahendrini Fernando Ariyachandra
Source: check_circle
University College London

Challenges of transcending BIM information from design phase to real time on-site construction phase

2017-07-02 | Conference paper
SOURCE-WORK-ID:

2335225

Part of ISSN: 2362-0919
Contributors: M K Chamitha Sanjani Wijewickrama; Himal Suranga Jayasena; M R Mahendrini Fernando Ariyachandra
Source: check_circle
University College London

Procurement system selection model for the Sri Lankan construction industry

6th World Construction Symposium 2017
2017-07-02 | Conference paper
SOURCE-WORK-ID:

2335216

Part of ISSN: 2362-0919
Contributors: R A C Chanudha; P A P V D S Disaratna; M R Mahendrini Fernando Ariyachandra; S M N Anuruddika
Source: check_circle
University College London

Software capabilities of Sri Lankan architectural professionals for BIM adoption

2017-07-02 | Conference paper
SOURCE-WORK-ID:

2335219

Part of ISSN: 2362-0919
Contributors: E K A S Kumara; M R Mahendrini Fernando Ariyachandra; Himal Suranga Jayasena
Source: check_circle
University College London

Challenges of transcending BIM information from design phase to real time on-site construction phase

Proceedings of the 6th World Construction Symposium WCS 2017
2017-06 | Conference paper
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra

Procurement system selection model for the Sri Lankan construction industry

Proceedings of the 6th World Construction Symposium WCS 2017
2017-06 | Conference paper
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra

Software capabilities of Sri Lankan architectural professionals for BIM adoption

Proceedings of the 6th World Construction Symposium WCS 2017
2017-06 | Conference paper
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra

Comparative effectiveness of quantity surveying in BIM implementation

2016 | Journal article
Contributors: Kulasekara, G; Jayasena, HS; Ariyach; ra, MRMF
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra

Review on lean construction and tps approximation with BIM

2016 | Journal article
Contributors: Zuhair, MZM; Jayasena, Himal Suranga; Ariyach; ra, MRMF
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra

Strategies to develop effective BIM models to suit 4d modelling

2016 | Journal article
Contributors: Disthikar, MMM; Jayasena, HS; Ariyach; ra, MRMF
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra

Will an Estimator Look Smarter with BIM?

Unpublished
2016 | Other
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra
grade
Preferred source (of 2)‎

Comparative effectiveness of quantity surveying in BIM implementation

2016-09-10 | Conference paper
SOURCE-WORK-ID:

2309751

Contributors: Gemunu Kulasekara; Himal Suranga Jayasena; M R Mahendrini Fernando Ariyachandra
Source: check_circle
University College London

Comparative effectiveness of quantity surveying in BIM implementation

9th FARU International Research Conference (Faculty of Architecture Research Unit)
2016-09-09 | Conference paper
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra

Strategies to develop effective BIM models to suit 4D modelling

9th FARU International Research Conference (Faculty of Architecture Research Unit)
2016-09-09 | Conference paper
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra

Review on lean construction and TPS approximation with BIM

2016-07-31 | Conference paper
SOURCE-WORK-ID:

2309748

Contributors: M Z M Zuhair; Himal Suranga Jayasena; M R Mahendrini Fernando Ariyachandra
Source: check_circle
University College London

Will an Estimator Look Smarter with BIM?

2016-07-13 | Report
SOURCE-WORK-ID:

2335227

Contributors: M R Mahendrini Fernando Ariyachandra
Source: check_circle
University College London

Review on lean construction and TPS approximation with BIM

Proceedings of the 5th World Construction Symposium WCS 2016
Conference paper
Source: Self-asserted source
M R Mahendrini Fernando Ariyachandra

Peer review (30 reviews for 7 publications/grants)

Review activity for Automation in construction. (1)
Review activity for Buildings. (1)
Review activity for Engineering structures. (4)
Review activity for ISPRS open journal of photogrammetry and remote sensing. (1)
Review activity for Journal of computing in civil engineering. (7)
Review activity for Journal of construction engineering and management. (15)
Review activity for Sustainability. (1)